WWFAG is dedicated to raising awareness and respectful resistance to the Mt Challenger Wind Farm — a two-location wind farm proposed for the Whitsundays, first brought to community attention on 16 October 2025.

Contact Your Elected Representatives
Local and state representatives need to hear directly from residents

We’ve prepared a template for you.

Just cut and paste and adjust as per your preference. A list of contacts is below.

Dear [Name],

Re: Proposed Mt Challenger Wind Farm (Crystal Brook / Kelsey Creek near Proserpine, and Mt Challenger)

I am writing to express my strong opposition to the proposed Mt Challenger Wind Farm Project and to request your advocacy on behalf of the Whitsundays community.

This project is proposed in a location fundamentally incompatible with existing homes, agricultural land, and the established character of the region.

1. Inappropriate Siting and Proximity to Homes

This is not a remote or sparsely populated area — it is proposed within established rural communities and among homes.

Current setback guidelines of approximately 1.5 kilometres are outdated and do not reflect modern turbines, now reaching heights of up to 240 metres. At this distance, many homes would have little to no meaningful buffer — in some cases separated only by open cane paddocks.

A minimum setback of at least 3 kilometres should be considered. When applied here, a significant number of homes fall within this zone.

Emerging international research is also exploring setbacks of up to 10 kilometres in relation to infrasound and broader impacts. At this scale, the effect extends well beyond immediate neighbours into Proserpine and surrounding localities.

This is not an isolated development — it affects an entire region.

2. Scenic Amenity and Visual Impact

The Whitsundays is defined by its natural landscape of cane fields, mountain ranges, waterways, and open skies.

Turbines of this scale would dominate the skyline and be visible across key scenic corridors identified in the Whitsunday Planning Scheme, including views toward Proserpine Dam.

This represents a permanent industrialisation of a valued rural landscape and conflicts with the scenic amenity the planning framework seeks to protect.

3. Noise, Infrasound and Health Considerations

Wind turbines introduce continuous noise, low-frequency sound, and infrasound.

There is increasing international discussion about whether current setback distances adequately protect community wellbeing. Given the proximity to homes, a precautionary and independently assessed approach is essential.

4. Impacts on Agriculture and Land Use

This project sits within State and locally important agricultural land, including active sugar cane farming — a backbone of the Whitsundays economy.

Key concerns include:

  • Interference with GPS-guided farming
  • Restrictions on drone use
  • Reduced land use flexibility
  • Constraints on future operations and succession planning

This represents a long-term limitation on productive farmland central to the region’s identity.

5. Decommissioning and Long-Term Liability

There is uncertainty around the long-term removal of turbines and infrastructure.

Questions remain about responsibility, financial security, and the risk of infrastructure being left or repowered indefinitely.

Without up-front, enforceable guarantees, this places an unacceptable long-term burden on landholders and the community.

6. Impacts on Wildlife and the Natural Environment

The proposed sites intersect with habitat supporting vulnerable birds and bats.

AviSteps mapping identifies areas of high sensitivity, indicating elevated risks of collision, disturbance, and habitat fragmentation.

Species such as the Australian Bustard, Brolga, and Wedge-tailed Eagle are known in the region, along with important bat populations. These landscapes also provide critical ecological connectivity.

Given this sensitivity, it is difficult to comprehend how this site could be considered suitable for industrial-scale wind development.

7. Reef Catchments, Runoff and Cyclone Risk

The project sits within catchments flowing to the Great Barrier Reef.

Construction activities — including clearing, roads, and drainage — risk increased sediment runoff and water quality impacts.

In a cyclone-prone region, there are also concerns around erosion, infrastructure failure, and environmental damage during extreme weather events.

These risks must be carefully considered.

8. Community Consultation and Transparency

Many residents became aware of this project informally rather than through direct consultation.

Given the scale of impact, engagement must extend beyond immediate neighbours and meaningfully involve the broader community.

In Closing

This project raises serious concerns regarding proximity to homes, visual impact, agriculture, environmental values, and long-term community wellbeing.

I respectfully request that you:

  • Advocate for a pause on the project
  • Ensure independent and comprehensive assessment
  • Support planning frameworks reflecting modern turbine scale
  • Encourage consideration of more appropriate locations

Thank you for your time and representation of our community.

I would appreciate your response outlining how you intend to address these concerns.

Sincerely,
[Your Name]

Name & RoleRelevanceEmailContact Details
Amanda Camm MP
Member for Whitsunday
The local State Member representing the electorate in which the wind farm sits (or nearby).
As the local MP, this role is the community’s primary voice in State Parliament.

whitsunday@parliament.qld.gov.au
Electorate Office: Suite 2, Federation House, 20 Chapman Street, Proserpine QLD 4800
Phone: (07) 4845 3100
David Janetzki MP
Treasurer & Minister for Energy (Qld)

As Minister for Energy and the Clean Economy, this portfolio is directly relevant to wind farm approvals, renewable energy policy, and infrastructure development.


toowoomba.south@parliament.qld.gov.au
Phone: (07) 4602 3100
Postal Address: T4, Level 1, 677–683 Ruthven Street, South Toowoomba QLD 4350
Dale Last MP
Minister for Natural Resources & Mines;
Regional & Rural Development

Wind farm projects often intersect with land tenure, natural resources, and rural and community impacts. This portfolio is relevant to approvals and regional development.


burdekin@parliament.qld.gov.au
Phone: (07) 4767 0500
Address: Shop E, East End Centre, 54–60 Queen Street, Ayr QLD 4807
Andrew Wilcox MP
Federal Member for Dawson
Federal representative for the region.
andrew.willcox.mp@aph.gov.au
Level 2, 47 Gordon Street, Mackay QLD 4740
Phone: (07) 4944 0662
Whitsunday Regional Council

A council that actively raises concerns can strengthen the case that a proposal is not suitable for a particular location, even if renewable energy is supported in principle.

A council can reject a community benefit agreement from the proponent.


info@whitsundayrc.qld.gov.au
PO Box 104, Proserpine QLD 4800
Phone: 1300 972 753
John Collins
Local Councillor – Division 3
Councillor for Division 3, which includes Kelsey Creek and Crystal Brook.
john.collins@whitsundayrc.qld.gov.au
Mobile: 0429 059 726